Skip navigation
Please use this identifier to cite or link to this item: http://repository.iitr.ac.in/handle/123456789/9012
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGupta A.-
dc.contributor.authorKumar A.-
dc.contributor.authorKhatod, Dheeraj Kumar-
dc.date.accessioned2020-10-09T05:54:27Z-
dc.date.available2020-10-09T05:54:27Z-
dc.date.issued2019-
dc.identifier.citationEnergy (2019), 183(): 716-732-
dc.identifier.issn3605442-
dc.identifier.urihttps://doi.org/10.1016/j.energy.2019.06.112-
dc.identifier.urihttp://repository.iitr.ac.in/handle/123456789/9012-
dc.description.abstractThe existing hydropower plants that were built to serve the base load in the past are now made to run as stand-by units to take up the variation in generation caused due to the increasing solar and wind energy in the grid. This reduces the generation as well as the revenue of these plants and creating a conflict of interest between generating companies and system operators. Thus, arising a need to revise the operating policies of existing hydropower plants, not only for the present capacities of solar and wind but also taking future additions into the account. This problem is taken up in this study on behalf of the state power generating company for their existing hydropower plants. The optimization is carried out using two algorithms, i.e. non-linear optimization and logical optimization. The optimization results provide certain operational observations on many powerhouses, following which the generation could be increased without any additional investment. The algorithms when used for the future additions of solar, wind and thermal, is found to be quite sensitive to the reservoir inflow data. The critical comparison of the used algorithms reveals that rule of thumb can also perform very well when compared with the true optimization. © 2019 Elsevier Ltd-
dc.language.isoen_US-
dc.publisherElsevier Ltd-
dc.relation.ispartofEnergy-
dc.subjectHydropower-
dc.subjectOperational policies-
dc.subjectOptimization-
dc.subjectScheduling-
dc.subjectSolar-
dc.subjectWind-
dc.titleOptimized scheduling of hydropower with increase in solar and wind installations-
dc.typeArticle-
dc.scopusid57214417478-
dc.scopusid57216775596-
dc.scopusid35217827300-
dc.affiliationGupta, A., Department of Hydro and Renewable Energy (HRED) (Formerly Alternate Hydro Energy Centre (AHEC)), Indian Institute of Technology Roorkee, Roorkee, Uttarakhand 247667, India-
dc.affiliationKumar, A., Department of Hydro and Renewable Energy (HRED) (Formerly Alternate Hydro Energy Centre (AHEC)), Indian Institute of Technology Roorkee, Roorkee, Uttarakhand 247667, India-
dc.affiliationKhatod, D.K., Electrical Engineering Department (EED), Indian Institute of Technology Roorkee, Roorkee, Uttarakhand 247667, India-
dc.description.fundingThis research project was funded and supported by Karnataka Power Corporation Limited (KPCL), Bengaluru. The basic data, drawings, figures were obtained from KPCL and is acknowledged thankfully. The support and cooperation provided by Mr M Shivamallu, Chief Engineer, Mr NV Raghuram, Superintendent Engineer, Mr Srinivas Shenoy, Executive Engineer from KPCL is sincerely acknowledged. The cooperation extended by Mr Pallav Jain is also acknowledged.-
dc.description.correspondingauthorGupta, A.; Department of Hydro and Renewable Energy (HRED) (Formerly Alternate Hydro Energy Centre (AHEC)), Indian Institute of Technology RoorkeeIndia; email: 26akshita@gmail.com-
Appears in Collections:Journal Publications [EE]
Journal Publications [HRE]

Files in This Item:
There are no files associated with this item.
Show simple item record


Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.