Skip navigation
Please use this identifier to cite or link to this item: http://repository.iitr.ac.in/handle/123456789/16962
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSundeep Kumar M.-
dc.contributor.authorGupta, Chandra Prakash-
dc.date.accessioned2020-12-02T14:28:41Z-
dc.date.available2020-12-02T14:28:41Z-
dc.date.issued2012-
dc.identifier.citationProceedings of 2012 International Conference on Advances in Power Conversion and Energy Technologies, APCET 2012, (2012). Mylavaram, Andhra Pradesh-
dc.identifier.isbn9.78147E+12-
dc.identifier.urihttps://doi.org/10.1109/APCET.2012.6302007-
dc.identifier.urihttp://repository.iitr.ac.in/handle/123456789/16962-
dc.description.abstractIn a deregulated electricity market, it may always not be possible to dispatch all of the contracted power transactions due to congestion of the transmission corridors. System operators try to manage congestion, which otherwise increases the cost of the electricity and also threatens the system security and stability. In this paper, congestion management by rescheduling of generators has been proposed in pool model without bilateral contracts and pool model with one bilateral contract, also compares the amount of rescheduling in both cases. For optimal selection of participating generators a technique based on generator sensitivities to the power flow of congested lines is used. Also this paper proposes an algorithm based on particle swarm optimization (PSO) which minimizes the deviations of rescheduled values of generator power outputs from scheduled levels. The effectiveness of the proposed methodology has been analyzed on IEEE 30-bus and IEEE 118-bus systems. © 2012 IEEE.-
dc.language.isoen_US-
dc.relation.ispartofProceedings of 2012 International Conference on Advances in Power Conversion and Energy Technologies, APCET 2012-
dc.subjectcongestion management-
dc.subjectGenerator sensitivities-
dc.subjectoptimal rescheduling-
dc.subjectparticle swarm optimization-
dc.titleCongestion management in a pool model with bilateral contract by generation rescheduling based on PSO-
dc.typeConference Paper-
dc.scopusid55445594600-
dc.scopusid7202352469-
dc.affiliationSundeep Kumar, M., IIT Roorkee, Electrical Dept., Roorkee, India-
dc.affiliationGupta, C.P., IIT Roorkee, Electrical Dept., Roorkee, India-
dc.description.correspondingauthorSundeep Kumar, M.; IIT Roorkee, Electrical Dept., Roorkee, India; email: sundeep.2022@gmail.com-
dc.identifier.conferencedetails2012 International Conference on Advances in Power Conversion and Energy Technologies, APCET 2012, Mylavaram, Andhra Pradesh, 2-4 August 2012-
Appears in Collections:Conference Publications [EE]

Files in This Item:
There are no files associated with this item.
Show simple item record


Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.